Article

monitor.co.ugmonitor.co.ug on 2019-12-02 17:00

Locals build makeshift bridge over R. Sezibwa

The canoe operators have been charging Shs2,000 for each trip and Shs4,000 for one with a motorcycle or bicycle to cross the stretch, which is about ...

Related news