Newstral
Article
deeside.com on 2017-06-13 13:17
A494 / A55 Deeside corridor upgrade – red route looks set to get formal council backing
Related news
- First public exhibition of the £200m A494/A55 Deeside corridor starts todaydeeside.com
- Deeside Corridor – Date for consultation on £200m A494/A55 major improvement work firmed updeeside.com
- Welsh Government consultation on £200m A494/A55 Deeside corridor overhaul begins todaydeeside.com
- Additional A55/A494/A548 Deeside Corridor improvements exhibition to be helddeeside.com
- Very heavy traffic on A55 and A494 through Deeside following a collisiondeeside.com
- Broken down JCB on A494 in Deeside causing long delaysdeeside.com
- Delays reported on the A494 in Deeside following collisiondeeside.com
- Deeside traffic update: A494 eastbound lane closures due to be lifted by 1pmdeeside.com
- ‘Pollution reducing’ temporary 50mph speed limit on A494 through Deeside looks set to be made permanentdeeside.com
- Welsh Government “in discussions“ about installing average speed cameras on 50mph section of A494 through Deesidedeeside.com
- Collision on A494 in Deeside causing delaysdeeside.com
- Consultation on A494/A55 improvements works set for March 2017deeside.com
- Delays on A494 and A55 through Flintshire following a collisiondeeside.com
- Traffic building on the A494 and A55 following a collisiondeeside.com
- Congestion on A55 and A494 westbound due to two collisionsdeeside.com
- Mark Tami: 30ft high air quality barriers along A494 in Deeside an “unacceptable imposition on the community”deeside.com
- Lane closure on A494 in Deeside following a collisiondeeside.com
- Lane closed on A494 in Deeside following a collisiondeeside.com
- Updated: Delays ease along A494 in Deeside following earlier collisiondeeside.com
- Deeside: A494 entry slip road closed following ‘crash’deeside.com